top of page

OUR MISSION STATEMENT

Sewage Treatment Station

GEO, Inc.'s mission is to become the leading global provider of effective, economical, and sustainable environmental remediation services.

Night site

GLOBAL LEADERS IN REMEDIATION TECHNOLOGY

Comprehensive Environmental Remediation Solutions

GEO Remediation Company’s offerings of Gas Thermal in-Situ or Ex-Situ remediation, C3™ technology to remove petroleum and chlorinated VOCs from off-gas, and cutting-edge combined remediation systems are unparalleled in the industry. As a Women-Owned Small Business (WOSB) GEO is the sole provider of 8+ patented or trademarked technologies, Including: 

C3 VAPOR TREATMENT

Maximize your remediation efficiency with C3 Technology. Using a three-step process of Compression, Cooling, and Condensation, C3 captures over 99.9% of Volatile Organic Compounds (VOCs) from soil off-gas. Instead of venting or burning contaminants, our system converts them into liquid for sustainable recycling or disposal. With capacities ranging from 50 to 5,000 scfm, C3 solutions are ready for projects in North America, Europe, Australia, and beyond.  

Gemini_Generated_Image_l70vmel70vmel70v_edited

THERMAL REMEDIATION

Thermal Conduction Heating (TCH) is one of the most robust and frequently deployed methods of In Situ Thermal Remediation.  GEO’s patented GTR® technology allows natural gas, propane or liquid fuel to be used to power the TCH system. Common benefits of using the GTR® method vs. electrical heating are:

  • No electrical upgrades required at many projects

  • Existing natural gas supply sufficient at small-to-medium sites

  • System is modular with no complex central distribution systems

  • Standard heaters provide up to 2 kW per meter length output

ex-situ

CASE STUDIES

c3 compressed.jpg

VAPOR TREATMENT

How GTR Works Horizontal.jpg

IN-SITU

9f234c_e98f445c7f8f43cd94a4f56052b2dccd.avif

EX-SITU

Vapor traetment

MEET OUR TEAM

Recognized leaders in applied environmental
research and subject matter experts.

CASE STUDIES

A Glimpse into Our Growth

35

Years Experience

210

Project Completed

8M

Pounds VOC Mass Removed

21

Countries Served

NEWS

bottom of page